CUMPRINC adds up the principal portion of a run of loan payments: how much of the balance you have actually paid off. =CUMPRINC(0.054/12,300,180000,1,12,0) returns about -3,501.42, the principal repaid in the first year of a 25-year, 5.4% loan of 180,000.
The six arguments
All six arguments are required, and they are the same as for CUMIPMT.
- rate is the rate per period. For monthly payments, divide the annual rate by 12.
- nper is the total number of payments, in the same unit as the rate.
- pv is the amount borrowed, entered as a positive number.
- start_period and end_period choose which payments to total. Year 1 is 1 to 12, year 2 is 13 to 24.
- type is 0 for payments at the end of the period, or 1 for the start.
The result is negative
Money you pay out is negative in Excel's convention, so CUMPRINC returns a negative number for a loan. Use =-CUMPRINC(...) for a positive figure in a report.
What it tells you
In the early years of a level-payment loan, most of each payment is interest. CUMPRINC shows how slowly the balance falls: in the example above, year 1 repays about 3,501 and year 2 about 3,695, because each year's interest is a little lower than the last. Over all 300 payments, CUMPRINC returns the full 180,000.
Common patterns
- Principal repaid in year n:
=-CUMPRINC(rate/12,years*12,loan,(n-1)*12+1,n*12,0). - Balance after year n:
=loan+CUMPRINC(rate/12,years*12,loan,1,n*12,0). Because CUMPRINC is negative, adding it reduces the loan. - Check the split: CUMPRINC plus CUMIPMT over the same periods equals the number of payments times the PMT amount.
- A single payment: set the start and end to the same period. This matches PPMT.
Errors
CUMPRINC returns #NUM! if rate, nper or pv is zero or negative, if start_period is below 1 or after end_period, or if type isn't 0 or 1.
CUMPRINC or PPMT
PPMT gives the principal for one period. CUMPRINC totals a range of periods in a single cell, which is shorter than twelve PPMT cells added together for a year. Both assume a fixed rate and level payments, so extra repayments and rate changes need a full schedule.