PPMT returns how much of one payment reduces the loan balance, the principal, as opposed to the interest. =PPMT(6%/12,1,24,15000) returns -589.81: of the 664.81 first payment on a 15,000 loan at 6% a year over 24 months, 589.81 pays down the debt and 75.00 is interest.
Principal plus interest equals the payment
For each period, PMT = IPMT + PPMT. On a standard loan the payment is constant. Early on most of it is interest, so the principal part is small. Each month the balance falls, interest falls with it, and a larger share of the same payment goes to principal. PPMT shows this growth: 589.81 in month 1 rises to 661.50 in month 24 in the example above.
The arguments
- rate is the rate per period. Divide a yearly rate by 12 for monthly payments.
- per is the payment number you want, from 1 to nper. A period outside the range returns
#NUM!. - nper is the total number of payments.
- pv is the loan amount. fv and type are optional and work as in PMT.
Sign convention: cash out is negative
A loan you receive is positive, and the principal you repay is cash out, so PPMT returns negative numbers. Use =-PPMT(...) if you want to see them as positive repayments. Because principal repayments across the full term add up to the original loan, =-SUM(PPMT(rate/12,SEQUENCE(nper),nper,loan)) equals the loan amount exactly. That is a handy check that your arguments are consistent.
A quick amortisation schedule
Put the period numbers down column A. In the next columns calculate:
- Payment:
=-PMT(rate/12,nper,loan) - Interest:
=-IPMT(rate/12,A2,nper,loan) - Principal:
=-PPMT(rate/12,A2,nper,loan) - Balance: the previous balance minus the principal.
Lock the loan details with dollar signs so they don't shift when you fill down. The final balance should reach zero, give or take rounding.
Principal paid over a period
To find the principal repaid in a year, add the twelve monthly figures. CUMPRINC does this in one call. The sign rules are the same.
Limits
PPMT assumes a fixed rate and a fixed payment. Extra repayments, rate changes and fees need a schedule built by hand. If the payments are made at the start of each period (type 1), the amounts change slightly, because the first payment contains no interest.