CUMIPMT adds up the interest portion of a run of loan payments. It saves you from building an amortisation schedule just to answer "how much interest do we pay in year one?". =CUMIPMT(0.06/12,360,200000,1,12,0) returns about -11,933.19: the interest in the first twelve payments of a 30-year, 6% loan of 200,000.
The six arguments
All six arguments are required.
- rate is the rate for one period. Match it to the payment frequency: annual rate divided by 12 for monthly payments.
- nper is the total number of payments over the life of the loan, in the same unit as the rate.
- pv is the amount borrowed. Enter it as a positive number.
- start_period and end_period choose the slice of payments. For year 1 use 1 and 12, for year 2 use 13 and 24, and so on.
- type is 0 for payments at the end of each period (the usual case) or 1 for payments at the start.
The result is negative
CUMIPMT follows the cash-flow sign convention: money you pay out is negative. The result for a loan is therefore negative. Put a minus sign in front, =-CUMIPMT(...), if you want a positive cost of interest for a report.
Common patterns
- Interest in year n:
=-CUMIPMT(rate/12,years*12,loan,(n-1)*12+1,n*12,0). - Total interest over the life of the loan: use 1 and nper as the start and end periods.
- Interest in a single month: set start and end to the same number. This matches IPMT for that period.
- Check against the payment: interest plus CUMPRINC over the same periods equals the number of payments times the PMT amount.
Errors
CUMIPMT returns #NUM! if rate, nper or pv is zero or negative, if start_period is less than 1, if start_period is greater than end_period, or if type is anything other than 0 or 1. Zero-interest loans therefore can't use it, because the interest is zero anyway.
CUMIPMT or IPMT
IPMT returns the interest for one period, so a year of interest would need twelve IPMT cells added together. CUMIPMT does the sum in a single cell. Use IPMT when you want the schedule line by line and CUMIPMT when you want a total for a year or the whole loan.
Fixed-rate loans only
CUMIPMT assumes a fixed rate and equal payments. It can't handle extra repayments, interest-only periods or a rate change part-way through. For those, build a schedule.